Building Technologies / Contractor

Launch: Afyonkarahisar Housing Project →

Delivered on time.One-piece structure.

From institutional buildings to housing communities, we deliver on a double-panel structural system — on schedule, under single responsibility.

Afyonkarahisar · Launch Period

  • Launch period is now open
  • Low-rise residential community
  • Earthquake-resilient double panel system
  • Interest-free payment after handover
  • Notarised contract

§ 01Approach

A building delivered late has failed, however well it was designed.

Site while the panel walls are being assembled

Antema Yapı is a contractor. Our work is not to be admired; it is to hand over the building we committed to, on the date we committed to, within the tolerance we committed to.

0102030405
Wall section
  1. 01Shotcrete
  2. 02EPS core
  3. 03Cast-in-place concrete
  4. 04EPS core
  5. 05Shotcrete
  6. Steel mesh

Because the panels are produced under controlled factory conditions, weather, labour fluctuation and on-site workmanship are taken off the critical path. There is one party accountable: us.

§ 02From the site

Walls are prepared in the factory and rise on site.

From earlier projects built with the same system.

§ 03Structural System

Double-Panel (Shear Wall) Structural System

The space between the two panels is filled with concrete, and 35 mm of C40-class shotcrete is applied to both outer faces. The walls act as shear walls, and the building behaves as a single monolithic piece without columns or beams.

This section contains an interactive three-dimensional section. A static view is shown in line with your motion preference.

Steel-mesh panel walls around a door opening, with diagonal extra mesh above and at the corners.
Door and window corners are reinforced with extra mesh.

§ 04Comparison

A difference of method, not of material.

What follows is not about strength class or brand. It is about where a building is produced, under what conditions, and who answers for it.

Production environment
Conventional frame + infillProduction takes place on an open site.
Antema Yapı (Double-Panel System)Panels are made in a factory; concrete is sprayed on site.
Dimensional tolerance
Conventional frame + infillDimensional tolerance depends on site workmanship.
Antema Yapı (Double-Panel System)Panel dimensions are fixed in the factory, so less correction is needed on site.
Programme risk
Conventional frame + infillMost of the work happens on site, so the programme follows site conditions.
Antema Yapı (Double-Panel System)Panel production runs independently of site work. What remains on site is assembly and shotcrete.
Thermal continuity
Conventional frame + infillInsulation is a separate work item.
Antema Yapı (Double-Panel System)Insulation sits inside the wall section.
Seismic behaviour
Conventional frame + infillThe structural frame and the infill walls act as separate elements.
Antema Yapı (Double-Panel System)The walls act together as shear walls; there are no columns or beams.
Accountability
Conventional frame + infillWork items may be carried out by separate subcontractors.
Antema Yapı (Double-Panel System)One party, from production through assembly.

Concrete class: C40 shotcrete (40 MPa)

§ 05Capability

Six stages, from feasibility to handover.

Each stage produces the input for the next. The following stage does not begin until the previous one closes — that is where the programme comes from.

  1. 01 / 06

    Feasibility and early assessment

    Site, zoning and brief are tested against the system to establish suitability and a coarse cost range.

  2. 02 / 06

    Structural design

    Structural system, connection details and reinforcement layout are engineered and taken through approval.

  3. 03 / 06

    Production planning

    The panel schedule, production plan and delivery sequence are built around the assembly programme.

  4. 04 / 06

    Panel production and quality control

    Steel-mesh EPS panels are made in the factory. Dimensional checks are recorded for every batch.

  5. 05 / 06

    On-site assembly and shotcrete

    Panels are assembled on site, both faces are sprayed with shotcrete and the core is cast in place. Site time is assembly time.

  6. 06 / 06

    Handover

    Delivered with as-built documentation, inspection records and the scope of warranty.

Work we take on

  • Residential
  • Commercial
  • Industrial

§ 06Video

The build process

A short look from the site, from panel assembly to shotcrete.

§ 07Active Project

Afyonkarahisar Housing Project
Open Site Plan ↗

Concept image; layout and unit count are being finalised.

Launch Period Live

Afyonkarahisar Housing Project

Afyonkarahisar: a Ground + 2 Floors housing community. Delivery target of 8 months from permit.

Launch Period

Inquire for low-rise architecture, advanced seismic safety, and launch privileges.

§ 08Briefing

Let us discuss your project.

If the site, programme and scale are known, the feasibility assessment can begin today.

Request a corporate briefing