Delivered on time.One-piece structure.
From institutional buildings to housing communities, we deliver on a double-panel structural system — on schedule, under single responsibility.
Afyonkarahisar · Launch Period
- Launch period is now open
- Low-rise residential community
- Earthquake-resilient double panel system
- Interest-free payment after handover
- Notarised contract
§ 01Approach
A building delivered late has failed, however well it was designed.

Antema Yapı is a contractor. Our work is not to be admired; it is to hand over the building we committed to, on the date we committed to, within the tolerance we committed to.
- 01Shotcrete
- 02EPS core
- 03Cast-in-place concrete
- 04EPS core
- 05Shotcrete
- Steel mesh
Because the panels are produced under controlled factory conditions, weather, labour fluctuation and on-site workmanship are taken off the critical path. There is one party accountable: us.
§ 02From the site
Walls are prepared in the factory and rise on site.

01Foundation 
02Panel and prop 
03Shotcrete 
04Rough structure
From earlier projects built with the same system.
§ 03Structural System
Double-Panel (Shear Wall) Structural System
The space between the two panels is filled with concrete, and 35 mm of C40-class shotcrete is applied to both outer faces. The walls act as shear walls, and the building behaves as a single monolithic piece without columns or beams.
This section contains an interactive three-dimensional section. A static view is shown in line with your motion preference.

§ 04Comparison
A difference of method, not of material.
What follows is not about strength class or brand. It is about where a building is produced, under what conditions, and who answers for it.
Comparison
Conventional frame + infill
Antema Yapı (Double-Panel System)
- Production environment
- Conventional frame + infillProduction takes place on an open site.
- Antema Yapı (Double-Panel System)Panels are made in a factory; concrete is sprayed on site.
- Dimensional tolerance
- Conventional frame + infillDimensional tolerance depends on site workmanship.
- Antema Yapı (Double-Panel System)Panel dimensions are fixed in the factory, so less correction is needed on site.
- Programme risk
- Conventional frame + infillMost of the work happens on site, so the programme follows site conditions.
- Antema Yapı (Double-Panel System)Panel production runs independently of site work. What remains on site is assembly and shotcrete.
- Thermal continuity
- Conventional frame + infillInsulation is a separate work item.
- Antema Yapı (Double-Panel System)Insulation sits inside the wall section.
- Seismic behaviour
- Conventional frame + infillThe structural frame and the infill walls act as separate elements.
- Antema Yapı (Double-Panel System)The walls act together as shear walls; there are no columns or beams.
- Accountability
- Conventional frame + infillWork items may be carried out by separate subcontractors.
- Antema Yapı (Double-Panel System)One party, from production through assembly.
Concrete class: C40 shotcrete (40 MPa)
§ 05Capability
Six stages, from feasibility to handover.
Each stage produces the input for the next. The following stage does not begin until the previous one closes — that is where the programme comes from.
01 / 06
Feasibility and early assessment
Site, zoning and brief are tested against the system to establish suitability and a coarse cost range.
02 / 06
Structural design
Structural system, connection details and reinforcement layout are engineered and taken through approval.
03 / 06
Production planning
The panel schedule, production plan and delivery sequence are built around the assembly programme.
04 / 06
Panel production and quality control
Steel-mesh EPS panels are made in the factory. Dimensional checks are recorded for every batch.
05 / 06
On-site assembly and shotcrete
Panels are assembled on site, both faces are sprayed with shotcrete and the core is cast in place. Site time is assembly time.
06 / 06
Handover
Delivered with as-built documentation, inspection records and the scope of warranty.
Work we take on
- Residential
- Commercial
- Industrial
§ 06Video
The build process
A short look from the site, from panel assembly to shotcrete.
§ 07Active Project

Concept image; layout and unit count are being finalised.
Afyonkarahisar Housing Project
Afyonkarahisar: a Ground + 2 Floors housing community. Delivery target of 8 months from permit.
Dwelling Typologies
Launch Period
Inquire for low-rise architecture, advanced seismic safety, and launch privileges.
§ 08Briefing
Let us discuss your project.
If the site, programme and scale are known, the feasibility assessment can begin today.
Request a corporate briefing