§ 01Projects

Afyonkarahisar Housing Project & Our Potential Projects

Housing communities built with steel-mesh EPS panels and shotcrete, with a delivery target of 8 months from permit.

§ 01AFYONKARAHISAR

Active Pre-Registration & Launch PeriodHousing Project for Union Members

Afyonkarahisar Housing Project

Low-Rise Housing Community for Union Members

A secure housing community of ground + 2 floor blocks in central Afyonkarahisar, reserved for union members. Galvanised steel-mesh EPS panels are manufactured in the factory and assembled on site, then sprayed with shotcrete on both faces. The community offers open parking, EV charging infrastructure, children’s play areas and private garden shares on the ground floors.

Site Area

9.165 m²

Project site

Floors

Ground + 2 Floors

Concrete · C40 shotcrete

Home Types

2+1 · 3+1

Unit count and areas being finalised

Delivery Target

8 Months

From building permit

Project Briefing & Pre-RegistrationHousing Project for Union Members

Information and Pre-Registration

Pre-registration has opened for the housing project in Afyonkarahisar, reserved for union members. Fill in the form to be considered for the limited allocation and to join the next information meeting.

Afyonkarahisar Housing Project Aerial View
Enlarge Image

Concept image; layout and unit count are being finalised.

Home Types

Home Types

The home types in the community.

  • 01

    2+1

  • 02

    3+1

Unit count, areas and floor plans will be published on this page once they are finalised, and shared at the information meeting.

Tests

A tested system

  • Laboratory rig testing a wall specimen under load.

    Earthquake

    Full-scale test

    Showed ductile behaviour in compression, bending, connection and cyclic load tests.

    Source: Süleyman Demirel University, Civil Engineering Steel Structures Laboratory · EAD 340002-00-0204

  • Wall specimen mounted on a fire-resistance test furnace.

    Fire

    108 min

    Kept its load-bearing capacity under load at 1000°C.

    Source: Efectis Era Avrasya, TS EN 1365-1

  • Perlite insulation plaster being applied to the interior face

    Perlite insulation plaster being applied to the interior face

    Thermal insulation

    U = 0.30 W/m²K

    Lower heating cost in winter.

    Source: Manufacturer technical data

  • Acoustic laboratory where sound insulation was measured.

    Sound insulation

    Rw 38 dB

    Noticeably reduces noise from neighbours and the street.

    Source: BLX Acoustic Research Laboratory

The system has been tested to the EAD 340002-00-0204 European assessment document.

Values come from single-panel tests; the double panel used in this project contains more concrete and insulation.

Assurance

Guarantees

01 / GUARANTEE

Individual Floor-Easement Title at Plinth Stage

Once the plinth-level approval is granted, each rightsholder is registered a floor-easement title for their own unit.

Contractual & Legal Assurance

02 / GUARANTEE

Interest-Free Payment After Handover

After handover, the remaining balance can be paid without interest or commission.

Contractual & Legal Assurance

03 / GUARANTEE

Notarised Contract

Every commitment between the parties is put in writing in a notarised contract.

Contractual & Legal Assurance

Structural System

Double-Panel (Shear Wall) System

Factory-made steel-mesh EPS panels are assembled on site; the gap between the two panels is filled with concrete, and 35 mm of C40-class shotcrete is applied to both outer faces.

Double-Panel (Shear Wall) System
Galvanised steel-mesh EPS panels made in the factory are assembled on site. The gap between the two panels is filled with cast-in-place concrete, and both outer faces receive shotcrete.
Continuous Insulation Core
The EPS core forms an uninterrupted insulation layer through the wall.
Delivery Target of 8 Months from Permit
Because the panels are prepared in the factory, the work left on site is assembly and shotcrete; the programme is built around that.
Open Parking & Amenities
Open parking, EV charging stations, a children’s playground and a single security-controlled entrance inside the community.

Process

Six steps from application to handover.

  1. Step 01

    Pre-registration

    You fill in the form; pre-registration is not binding.

  2. Step 02

    Information meeting

    The project, the system and the contract process are explained.

  3. Step 03

    Notarised contract

    Commitments are put in writing in a notarised contract.

  4. Step 04

    Building permit

    The building permit is obtained.

  5. Step 05

    Construction

    Delivery target of 8 months from permit.

  6. Step 06

    Handover

    The homes are handed over.

From the site

Images from the site

Photos are from earlier projects built with the same system.

  • Aerial view of a foundation slab with the first wall panels in place and a truck delivering more panels.
    01 · Foundation
  • Dark EPS wall panels standing on the foundation slab while three workers in hard hats align them.
    02 · Panel assembly
  • Two workers in hard hats setting a steel-mesh panel upright in a narrow space, braced with a steel prop.
    03 · Panel and prop
  • A worker spraying shotcrete onto a steel-mesh panel wall; the fresh surface is rough and grey.
    04 · Shotcrete
  • Single-storey rough structure with finished shotcrete walls, open door and window openings and reinforcement bars showing at the top.
    05 · Rough structure

FAQ

Frequently asked questions

Can I hang an air conditioner, kitchen cabinets or a radiator on the wall?

Yes, with suitable anchors and fixings.

How are wiring and plumbing installed?

Services are placed inside the panel before shotcrete is applied, so walls are not cut open afterwards.

Orange electrical conduits and blue junction boxes placed inside the panel's mesh.
How long will the building last?

It is a reinforced-concrete system; its economic life is the same as other reinforced-concrete buildings (50–60 years).

Does the municipality accept this system?

The system has been tested to the EAD 340002-00-0204 European assessment document and appears in the Ministry’s unit-price definitions.

Is it fire resistant?

The fire test results are in the Tests section.

Go to the Tests section →
When will the unit count and areas be known?

They will be published on this page and shared at the information meeting once the project is finalised.

Is pre-registration binding?

No; it is for information only and no fee is charged for pre-registration.

For Union Members

Afyonkarahisar Housing Project Pre-Registration Form

Contact us for pre-registration and information.

The pre-registration form will open shortly.